AGIP KCO has awarded AVENCOM a two year long contract
Kashagan Field Development Experimental Program. AGIP KCO has awarded AVENCOM a two year long contract for the Engineering and Procurement for Telecommunication systems. More details about the project
AVENCOM became accredited to the ISO 9001 standard in 2003 and to the ISO 14001 and OHSAS 18001 standards in 2009
Compliance audit completed. AVENCOM Quality Management System, Environmental Management System and Occupational Health and Safety (OH&S) Management System have been audited by NACECS (National expertise and certification centre) to ISO 9001 , ISO 14001 and OHSAS 18001 standards. AVENCOM became accredited to the ISO 9001 standard in 2003 and to the ISO 14001 and OHSAS […]
AVENCOM 15
AVENCOM celebrated its 15th anniversary together with its Clients and Partners.
Confirmed: AVENCOM’s knowledge and experience in designing Cisco Systems
AVENCOM’s knowledge and experience in designing, installing, and supporting comprehensive, integrated network solutions of Cisco Systems has been confirmed, and it was recognised as having a Specialization in Advanced Routing and Switching.
AVENCOM Became TANDBERG’s Authorized Partner
AVENCOM became TANDBERG’s authorized partner. Example of a completed project
AVENCOM Becomes AVAYA’s Partner
AVENCOM becomes AVAYA’s partner. AVENCOM chose to partner with Avaya because Avaya is recognized as having the best in class products and technical support services.
AVENCOM was certified for Compliance with the Requirements of the Standards ISO 14001:2004 and 18001:2007
AVENCOM was certified for compliance with the requirements of the standards ISO 14001:2004 “Environmental Management System” and OHSAS 18001:2007 “Occupational Health and Safety Management System”
AVENCOM given works Contract by Karachaganak Petroleum Operating b.v.
AVENCOM given works Contract by Karachaganak Petroleum Operating b.v. AVENCOM has been awarded the 4th Stabilization and Sweetening Train Telecommunication works contract by Karachaganak Petroleum Operating b.v. The existing Phase II Karachaganak Oil and Gas Processing Complex currently has a capacity of 7.7 million tonnes per annum (MTA). The addition of a 4th train which […]
Construction of the assembly Workshop Building has been Successfully Completed
Construction of the assembly workshop building in Uralsk, Kazakhstan has been successfully completed. This expands AVENCOM’s capability for the in-house building of systems up to 50 standard telecommunication racks simultaneously.
Construction of the assembly Workshop Building has been started
Construction of the assembly workshop building has been started. The workshop is intended for the in-house build of automation and telecommunication systems for oil & gas enterprises. About 20 job opportunities will be provided for highly skilled specialists. Some of the employees will be trained in the Great Britain. Start-up is planned for September 2009.