PROJECT DETAILS

Project Overview

Project description

From the time of the construction of the KPO export pipeline in 2003, AVENCOM has been servicing its telecommunications systems. The
contract includes permanent supervision of all the system operating parameters at three key points – KRS, Bolshoi Chagan and Atyrau, preventative maintenance of equipment and SLA driven reactive response with arrival to site. 24/7 Service Desk function supports this project.
Company specialists, engaged in this contract, regularly undergo training on servicing SDH, and DWDM systems and LAN/WAN equipment in training centers including abroad.

AVENCOM scope of work

  1. Servicing the telecommunications
    infrastructure
  2. Providing personnel to service the export pipeline
  3. Testing the fibre-optic network
  4. Developing protection from unauthorised access to equipment
  5. Technical servicing of the internal cable television network
  6. Support for, modernization and extension of fibre optic lines

Products Used

  1. Cisco
  2. Ericsson
  3. T8 Pusk

Project statistics​

Location:Aksai, Bolshoi Chagan, Atyrau
Client:KPO b.v.
Total value:ongoing
HS incidents:0
Time elapse:N/A
Duration:Since 2009
Handover:Project ongoing

 

52560+

ENGINEERING HOURS