Modernization of HVAC Control System based on Siemens/Honeywell Equipment for KPO B.V.
Background After completion of phase II of the project KPO now operates the following facilities: the Karachaganak Processing Complex (KPC); the gas and liquids separation and re-injection plant – Unit 2; the gas and liquids separation plant – Unit 3; and the export pipeline Karachaganak-Bolshoi Chagan-Atyrau. AVENCOM Responsibility In 2016, under the current contract for […]
Automatic Control of HVAC Equipment in four buildings of the Chinarevskoye Oil and Gas Condensate Field
Background Nostrum’s current producing asset is the Chinareveskoye field – a 274km square licence block located to the north of Uralsk, near to the Russian border. The Chinarevskoye field has produced more than 100 million boe since 2004. It is positioned in the pre-Caspian basin, which is the location of numerous gas discoveries, including Rozhkovskoye […]
Precision conditioning of Data center for AGIP KCO Training Center
Background The work was carried out within the framework of Kashagan Field Development onshore project of AGIP KCO. The Kashagan field is located in the offshore part of the Caspian Sea, approximately 80 km from Atyrau. It contains 45 API oil with associated acid gas. Field development concerns onshore and offshore process facilities. AVENCOM Responsibility […]
AGIP KCO Bautino Base HVAC System
It was necessary to propose HVAC system for two external electrical units on the site of treatment facilities of drilling sludge and reduced crude water on AGIP KCO Base at Bautino village in Mangystau Region of Kazakhstan.
HVAC System for Bank CenterCredit building
Background Bank CenterCredit JSC was established on September 19, 1988. It is one of the first commercial banks in Kazakhstan. The bank has its own broad branches network around the republic, serves entities and persons in more than 100 branches and outlets. AVENCOM Responsibility In 2007, AVENCOM was approached by UralSauletService CC LLP with a […]
HVAC System of the Office Building of Perspektiva KAN LLP
AVENCOM developed a modern system for heating, ventilation and air-conditioning for the new office
building for the asphalt plant of LLP “Perspektiva Kan”.
KPO B.V. HVAC System Maintenance
After completion of phase II of the project KPO now operates the following facilities: the Karachaganak Processing Complex (KPC); the gas and liquids separation and re-injection plant – Unit 2; the gas and liquids separation plant – Unit 3; and the export pipeline Karachaganak-Bolshoi Chagan-Atyrau.